The center is forming cages of bored piles. The main principle of this center is creation in automated regime of spiral (using reinforcement wire in coil) and winding of this spiral with programmed pitch on the pre-installed longitudinal concrete steel rods.

Spiral welding could be done manually or automatically using WELDING ROBOT carrying out seam welding. As a whole, this assembly center consists of a basic carrying case with quite capacious total dimensions (in a standard version both for the piles of 12 m) of 17,3m x 4m., total dimensions of the center 25,7 х 4m.) This is one of the most evident positive features characterizing this center.